Remote Hands & Smart Hands SLAs: 24/7/365 On-Site Engineering Protocol

Technical Review: MassiveColo Critical Infrastructure Engineering Group

Defining field support capabilities: drive swaps, power cycling, console cabling, transceiver diagnostic OTDR testing, component RMA handling, and response time guarantees.

When hardware failures strike at 3:00 AM, data center Remote Hands and Smart Hands technicians serve as the physical extension of your remote network operations team.

1. Remote Hands Service Level Agreement (SLA) Matrix

Incident PrioritySeverity DescriptionGuaranteed Dispatch SLATypical Action
P1 (Critical Outage)Server down / Loss of transit link< 15 MinutesHard reboot, console cable attachment, optic swap
P2 (Degraded Redundancy)Failed redundant PDU / Drive error in RAID< 1 HourHot-swap drive replacement, PDU breaker verification
P3 (Scheduled Maintenance)Racking new chassis, patch cable run< 4 Hours / ScheduledChassis mounting, torque-spec bolting, labeling

MassiveColo Critical Infrastructure Engineering Group

Our data center engineering team specializes in Tier III/IV dual-corded electrical topologies, ASHRAE thermal management standards, BGP multi-homed carrier peering, and 24/7 Smart Hands facility operations.